Friday, June 17, 2011
You got a teeny little pick box
what you want it to, it frequently picks the wrong thing, causing you
to attempt to select or repeat commands. This makes the actual
execution of each command extremely slow. Why can't you change the
size of the pickbox? Why can't REVIT be smarter about what you want to
select? I have a difficult mind/body (haptic) relationship with REVIT.
This creates stress, which should be unnecessary.
How to print a schedule in REVIT
legend but not a schedule? WTF! Because I really don't need to check
this stuff, because you are "so smart" that you just get it right by
yourself? Because I really want to print the entire sheet? Because I
want to take the extra steps to export to EXCEL? No, it's because you
SU**!
How to draw straight lines in REVIT
and LEFT ON? Yes, I know some commands allow ortho (constrain) but why
on earth would I want it to be off sometimes and on sometimes? What
were they thinking?
which would only take about 3 seconds in ACAD? Just select the items,
press delete...
Grrrr....
I'll give REVIT what it wants...
Thinks that the answer to REVIT is to give REVIT what it wants.
Last I checked, my computer and it's software works for me, not the
other way around.
A huge fail of "good versus bad technology". IE: technology that works
for me = good, technology that requires that I do certain things to
make it happy = bad.
LAME
POLYLINES, oh how I miss you
I need to have some lines that are linked (so I can edit them
together) or just figure out their length together. Filled Regions are
lame by comparison - for example, they need to be closed figures,
where a polyline has the option of being open.
REVIT wants you to know early on exactly what your building will look
like, how it will be constructed and exactly where the walls go.
For example, we model our building in 3d, but use 2d for other
drawings - wall sections (for example). This is NOT the correct way to
do it - REVIT wants you to generate wall sections from 3d, and use 2d
to "clean up" the wall section - to make it actually look correct.
However, if you do this, the wall section will contain a mix of 3d and
2d information. If you were to move your building wall, the wall
section will get scrambled as the 2d information tries to determine if
it should stay fixed in space, or move with the 3d information.
Thusly, the only really safe thing to do is to draw the entire wall
section in 2d, as a drafting view.
This applies to most of your other drawings as well - details,
elevations and building sections.
However, if you are doing most of your drawings in 2d, why would you
use REVIT?
One might say that the answer is simply to know early on what the
building looks like. I've never seen an architectural project that
didn't get SOME sort of change during construction drawings, often
extensive. Thus far, this appears to be a huge time suck during CD's
and potentially create huge liability issues when information
disappears completely from your REVIT drawing.
REVIT = FAIL